Here are the steps required:
Note: Follow the steps in the build manual, and you can use this pictures to understand better!
Note: Follow the steps in the build manual, and you can use this pictures to understand better!
Open all boxes except resin containers (in white boxes) as they are sensitive. Remove the front, left and right panels. I didn't show here but add the feets to the bottom.
Linear stage: This is the long metal on the top of the box. You need to make the T-nuts loose (T-nut are the metals in each side). insert the motor to the hole.
It should match the border of case.
Inside look
After attaching the screws to the T-nuts
Align the module in hole to be in middle
T-nuts aligned.
It is like 3 mm from each side, then tighten the screws.
Take metal structure and remove plastic, the plastic part will be faced to front.
A shiny surface under plastic.
Attach screws from left to right,
It will look like this.
Align the screws like this
Attach and tighten each slowly, meaning don't tight one strong, but go through all with small steps.
Add heat sink to board
Remove plastic holders
Align board. TIP: Before attaching board, you can now attach the fan electric.
Attach board, and tighten
Board.
We will use this pins.
Plug
Attach fan.
The fan should be aligned to panel.
The electric connection of fan (as advised you can attach before)
Projector with plastic cover. I removed them completely, but then realized it is advised to use, so attached back some of them.
We will use this ones to attach.
Place them to 3 holes
2 spacers to the bottom screws.
Attach cables.
Place and tighten projector, again slowly, small steps to each.
Align screws in middle.
Disconnect electric of fan, find a screwdriver like this.
Connect wire to D9.
Red flag is positive.
Connected cables.
Attach rs232 to usb
Cables from the hole in back
Another view:
Use plastic from packaging to bring them together.
I used also cable collector (from ikea).
And the length of cable collector.
Cable collector inside.
Build platform
Use your fingers first
Then tighten.
Not necessary but good.
Build platform logo facing front
Attached
Aligned
Cables done.
Completed box.
after the top cover.
I haven't installed the resin container yet, but it is straightforward.